Cedar and Yellow Point
Home renovations in Cedar
Cedar is not in the City of Nanaimo. Building permits go to the Regional District of Nanaimo, and most property here is on well and septic.
Mid-Island Renovation Group renovates homes in Cedar, and the first thing we settle is that your building permit goes to the Regional District of Nanaimo, not the City of Nanaimo. Cedar sits in Electoral Area A alongside Cassidy, Yellow Point and South Wellington, and filing to the wrong authority simply gets your application returned. Most property here is on well and septic — the Cedar Sewer Service Area serves only about 128 residential and commercial connections — so if you are adding bedrooms, we confirm your septic field can carry the extra design flow before the drawings are finished.
The most common and most expensive assumption about renovating in Cedar is that the City of Nanaimo governs it. It doesn't, and getting that wrong costs you weeks you don't have, because we book work months ahead. We confirm the authority before we do anything else.
Whole-home renovation $250,000 to $400,000. Ground-floor addition $150,000 to $280,000. Second storey $250,000 to $450,000. On work over $100,000 add a $1,000 processing fee, then $250 plus 1 percent of construction value.
Which authority, and what needs a permit
Building Regulations Bylaw No. 1250 governs your property, and defines "construct" to include reconstructing, relocating, installing, repairing, altering, demolishing, moving, excavating and shoring. The regional district requires a permit before we alter, add to or repair an existing building, before we finish a previously unfinished area, and before we carry out interior structural renovations. The main exemption is an accessory building under 10 square metres.
What the regional district charges
The regional district takes a non-refundable processing fee with your application and credits it against the permit: $150 where the value of work is $20,000 or less, $450 from $20,001 to $50,000, $500 from $50,001 to $100,000, and $1,000 above $100,000. Its permit fee is $250 where value exceeds $20,000, plus 1 percent of construction value. It reduces that by 5 percent, capped at $500, where an engineer or architect certifies the work. Your application stays active six months, and an issued permit two years provided the first inspection occurs within six months. The regional district publishes no processing timeline, so we carry permitting in your schedule as a variable rather than a fixed block.
Septic and well
A septic filing from a Registered Onsite Wastewater Practitioner, accepted by Island Health, sits among the supporting documents for a building permit on unserviced property. On an addition that adds bedrooms, this is the constraint that most often reshapes a design: a field sized for the original house may not carry the added design flow, so we get that answer before the drawings are finalized.
Coastal property and the flood hazard permit area
The regional district adopted a Coastal Flood Hazard Development Permit Area on 10 September 2024, covering Electoral Areas A, E, G and H. Waterfront property in Cedar falls within it, and if yours does, you need a development permit alongside the building permit. The regional district sets the construction elevation that applies to your specific site rather than publishing a general figure, so we ask it that question early instead of designing to an assumption.
The pre-1990 survey, and what it changes
Section 20.112 of the BC Occupational Health and Safety Regulation requires a qualified person to inspect for hazardous materials before demolition, salvage or renovation begins, and places that duty on you as the owner as well as on the employers doing the work. Since 1 January 2024 WorkSafeBC has also required abatement employers to hold a licence and abatement workers to be certified. On construction of this era we treat the survey as a written report filed before the permit application, not something discovered once the walls are open. Sheet flooring, tile adhesive, textured ceiling finishes and pipe insulation are where it usually turns up, and we put whatever abatement scope it produces in your budget as a priced line.
Why the order matters
We do structure before mechanical, mechanical before insulation, insulation before finishes, and each stage has to clear its inspection before the next one starts. We close nothing in ahead of the inspection covering it. A full gut runs 7 to 14 months from the start of design to the day you move back in, and design and permitting take up 8 to 20 weeks of that.
Related: home additions · whole-home renovations · kitchen renovations · the renovation process · Ladysmith · Nanoose Bay · Parksville · Qualicum Beach
Confirming the authority and your septic position first saves you the most time on a Cedar project. The questionnaire covers both in about two minutes.
More about what we do and where we work
- Whole-Home Renovations in CedarTypically $250,000 to $400,000
- Home Additions in CedarGround floor $150,000–$280,000 · Second storey $250,000–$450,000
- Kitchen Renovations in CedarTypically $65,000 to $100,000+
- Bathroom Renovations in CedarTypically $25,000 to $50,000
- Basement Renovations in CedarTypically $60,000 to $140,000
Project inquiry
Tell us about the project
Five questions covering scope, budget, timeline and property. Enough for us to tell whether we are a fit for your project before either of us books a site visit.
Planning a major renovation?
Start with the project questionnaire — five questions covering scope, budget, timeline, and property. That tells us whether we're a fit for your project before either of us books a visit.